This text is machine-read, and may contain errors. Check the original document to verify accuracy.
IWTS
Attachment 7·A
Pricing Workbook
Service Level 1
Call Type
Local
Intralata
Interlata
Interstate
International
"lilaaer uuotes
Surcharge
(Note 1)
Current Rate Per
Minute (Note 2)
Baseline Rate Per
Minute (Note 3)
5%
$0.0:: $
0.04
$0.0:: $
0.04
$O.OE $
0.04
$O~l$ 0.89
SO.50
$O.OE
$0.50
$O.OE
$0.50
$O.OE
$3.95
$0.89
ForeiQn PIT Billed and Collected
Service Level 2
Call Type
Local
Intralata
Interlata
Interstate
International
Baseline Call Volume
1
High Volume Rate Per Minute
(Note 4)
$
$
$
$
10%
0.04
0.04
0.04
0.8
$
$
$
$
15%
0.04
0.04
0.04
0.89
20%
$
0.0<.:
$
0.0
$
0.0'
$
08'
Bidder Quotes
Surcharge
(Note 1)
Current Rate Per
Minute (Note 2)
51.50
$0.1
$1.50
$0.1
$2.00
$0.2
$3.95
SO.8
ForeiQn PIT Billed and Collected
Baseline Rate Per
Minute (Note 3)
5
$
$
$
0.15
0.15
0.22
0.89
High Volume Rate Per Minute
(Note 4)
5%
10%
15%
20%
$
0.14 $
0.12 5
0.11 5
o.
0.14 $
0.12 $
0.11 $
0.1
$
0.19 $
$
0.2 $
0.17 $
0.1
$
0.89 $
0.8S $
0.89 $
0.8
109,092,845
----"0_ _1
I
Nole 1 • Surcharge is fixed at this level by the Slate for the duration of the contract.
Nole 2 • Current Rale Per Minute is the predominale rate for CYA and CDC.
Note 3 - Baseline Rate Per Minute is Bidder's rate based on the Baseline Call Volume.
Note 4 - High Volume Rate Per Minute is Bidder's rale based on a 5%,10%,15%, or 20% increase in Baseline Call Volume.
Bidder's rates for each incremental increase shall be less than or equal to the preceding proposed rate. See SECTION 7, 7.2.
Page 1
Addendum 10
September 2, 2004